Past Jobs

Click an item below to see work completed. Please note this list is not complete.

1033 W. Van Buren

Work completed:

  • Bus Duct Repair

Adler Planetarium

Work completed:

  • Damper and VAV Control

Advocate Condell Medical Center

Work completed:

  • Pre-Action System

Aggreko USA

Work completed:

  • Parking Lot Lights Upgrade

Argonne National Laboratory

Work completed:

  • Lighting Replacement

Chicago Collegiate Charter School

Work completed:

  • Receptacle Replacement

Cadence Physician Group - part of Northwestern Medicine Dermatology Clinic

Work completed:

Chicago Public Schools

Work completed:

  • Agassiz Elementary School – Fire alarm upgrade
  • Hans Christian Andersen school – Lighting upgrade
  • CPS Headquarters
  • Theodore Roosevelt High School – Dental Lab
  • G.S. Hubbard High School – Lighting, fire alarm, and voice/ data upgrade

Chicago Transit Authority (CTA)

Work Completed:

  • 103rd St. Bus Garage Heating upgrade & BAS installation

City of Chicago Inspector's Building

Work completed:

  • Control Wiring to all T-Stat, Control Valves, Boilers, and AHUs

Elmhurst

Work completed:

  • Water Reclamation

Hines VA Hospital

Work completed:

  • Hybrid O.R. Upgrade (9 Photos)
  • Congregate Bathroom (4 Photos)
  • Jack & Jill Bathroom (4 Photos)
  • Omnicell – Automated Medication Dispensing Cabinets
  • Hines Fisher House – Fire Alarm Modifications
  • Oven Relocate Project
  • Upgrade Security – Bldgs. 12 & 13
  • 11th Floor Polytrauma and Extended Care Unit (9 Photos)
  • Data Closet Critical Power Rehab
  • Kitchen Cooling Tower Replacement
  • Patriot Kitchen Café Renovation
  • Bldg. 228 Heat Curtains
  • Bldg. 2 A/C Installation
  • Bldg. 200: Corridor D,E,F Light Replacement
  • Fuel Pump Day Tank Project
  • RFID Card Access Project
  • 12th & 13th Floors Women Clinic Remodel
  • Campus Security Phones Project
  • Bldg. 103 New Critical Power
  • 10th FL remodel
  • Building Core Shaft Lighting Installation
  • Director's Office Remodel
  • Blood Lab Critical Power
  • Bldg. 18 RFID Card Access Project
  • Bldg. 117 Replacement Lights
  • Operating Room 6 & 12 Isolation Power Panel Replacement
  • Critical Power Receptacle Replacement throughout Hospital

 

  • Main Condensate Pump Power Re-feed
  • Bldg. 217 Security and Systemax Upgrade
  • Campus Watermain Renovation
  • Bldg. 217 Patient Rooms: Headwall Lighting Upgrade
  • Digital Radiography and Fluoroscopy Installation
  • Siemens CT Scan Project
  • Portable PET/ CT scan
  • Medical Gas Cylinder Alarms Installation
  • Bldg. 113 CO2 Monitor Installation
  • SPD Sterilizer Replacement Project
  • Blood Lab Pole Power Relocation
  • Variable Frequency Drive (VFD) Control Panel Upgrade
  • Bldg. 8 Repair FMS Shop Space
  • Medical Gas Cylinder Alarms Installation
  • Replace Lab Equipment B200 & B01
  • Stryker System - O.R. Upgrade (13 Photos)
  • Patient Education Electrical Upgrades Basement 200
  • Bldg. 37 Office and Commons Area Renovation (6 Photos)
  • Bldg. 217 Kitchen Air Handling Unit (AHU) Replacement
  • Building 37 Parking Lot Expansion
  • Bldg. 217 Motor Control Center (MCC) Upgrade (3 Photos)
  • Building 221 Over Bed Lights & Low Voltage Controllers
  • PACU/ OR
  • 2nd Floor Surgery Zone Lights and Duty Stations
  • Building 228 Cardiac Rehab
  • Stress Lab and Building 1 Code Blue System
  • Building 38 Storage (5 Photos)

Ingalls Memorial Hospital

Work completed:

Jesse Brown VA Medical Center

Work completed:

  • CCTV Campus-wide Upgrade Project
  • Medical Gas Alarm Panel Upgrade
  • VA Exterior Sign Power Feed
  • Ultraviolet Lighting Banks - System wide AHU - throughout campus
  • Steris Equipment Power in GI Lab
  • Taylor Gate RFID Card Access Upgrade
  • AT&T Voice/ Data Upgrade
  • New VFD Installation AHU 12
  • Nuclear Medicine Bathroom Upgrade
  • Simplex Fire Alarm Upgrade
  • 8th Floor S. Wing Remodel
  • Aqua Physical Therapy Remodel
  • Elevator Sump Pump Project
  • 2nd FL Woman's Clinic - Bathroom Remodel
  • ARJO Patient Lift (phases 1, 2 & 3)
  • Cath Lab Uninterruptable Power Supply
  • Pharmacy Upgrade
  • Rectifier Replacement Project for Telecom System
  • Starbucks Renovation
  • Sprint Cellular Repeater Upgrade

 

  • Psych Ward Day Room Remodel
  • AC 20 - New Main Power Feed
  • Optical Clinic Lighting Upgrade
  • Freezer Emergency Back-up Power
  • Canteen Equipment Renovation
  • Police Armory Storage Renovation
  • House Fire Pump Replacement
  • Ogden Street Gate RFID Card Access Project
  • Campus Wide Cloth Wire Upgrade/ Renovation
  • Campus wide LED lighting upgrade
  • Instrument Air Compressor System Upgrade
  • F&NS Kitchen Conversion
  • Cooling Upgrade in Post Acute Care (PAC) Unit
  • Utility Riser Shaft Conduit Relocation Project
  • Campus Wide Cloth Wire Upgrade/ Renovation
  • Campus wide LED lighting upgrade
  • Instrument Air Compressor System Upgrade
  • F&NS Kitchen Conversion
  • Cooling Upgrade in Post Acute Care (PAC) Unit

John D. Dingell VA Medical Center (Detroit, Michigan)

Work in progress:

  • Varian Medical Systems – Linear Accelerator

John H. Stroger, Jr. Hospital of Cook County

Work completed:

LaSalle VA Community Based Outpatient Center

Work completed:

  • Patient Suite Renovation

LOEWS Hotel

Work completed:

  • Fusion Splice

Loyola University Medical Center

Work completed:

  • Postpartum Room (9 Photos)
  • Cardinal Bernardin Cancer Center Pharmacy
  • Imaging Infomatics Power Upgrade
  • Gift Shop Remodel
  • Steam Table Disconnect
  • Bldg. 150 Voice/ Data and Power Upgrade
  • EMS Basement Furniture Connections
  • Varian Medical Systems - TrueBeam Linear Accelerator (5 Photos)
  • Fountain Power/ Lights
  • Blood Bank Lab Rehab
  • Cubicle Power Critical Circuits
  • Cancer Center Fire Alarm Upgrade
  • 4th Floor Rehab
  • Stritch School of Medicine Auditorium A/V Power

 

  • Treadmill Rehab Power
  • Credit Union Additional Power
  • EMS Bldg. 110 Rehab
  • Old Admitting Nurse Call Upgrade
  • Nurse Call Upgrade SICU
  • Nourishment Center Rehab
  • 3rd FL MICU Nurse Call Upgrade
  • Lab 4656 Critical Power
  • Bldg. 120 Lighting Upgrade
  • Corridor Lighting Replacement
  • McGuire Bldg MATV Conduit
  • Anesthesiology Office Furniture Replacement
  • Postpartum Renovation
  • Bronchoscopy Stratacap

Midwest Orthopaedic Consultants

Work completed:

  • Site Prep for GE Optima XR640 system

National Museum of Mexican Art

Work completed:

  • Electrical Renovation

Naperville Imaging Center

Work completed:

Naval Station Great Lakes

Work completed:

  • Drill Hall at Recruit Training Command (RTC)

NCH Endoscopy Center

Work completed:

Norridge

Work completed:

  • John V. Leigh School Variable Frequency Drive (VFD) Replacement
  • John V. Leigh School Panel Replacement Project
  • John V. Leigh School Smart Board
  • J. Giles Elementary School Interior Lighting Upgrades
  • J. Giles Elementary School Parking Lot Lighting Maintenance
  • J. Giles Elementary School Panel Replacement Project
  • J. Giles Elementary School Exterior Lighting Upgrade

Northwestern Memorial Hospital

Work completed:

  • Anaerobic Gassing Manifold Replacement

Orangetheory Fitness - South Loop

Work completed:

Palos Heights High-Tech Medical Park

Work completed:

Privately-owned Manufacturing Company

Work completed:

  • 1200 Amp Service Upgrade

ProVita Cuisine

Work in progress:

  • Switchboard Upgrade
  • Baler Relocation Project
  • Fryer Feeder Relocation

Schaumburg Park District

Work completed:

St. Alexius Medical Center

Work completed:

  • Emergency Room X-Ray Remodel

St. Bernard Hospital

Work completed:

  • Pre-Action System

Stepan Company

Work completed:

  • Aiphone – Video Security Intercom Installation
  • 3rd Floor Renovation – Cubicle Power
  • Electrical Renovation of Copy Center
  • Stairwell Lighting Replacement Upgrade
  • Generac 150 kW Emergency Stand-by Generator Installation
  • 2nd Floor Renovation – Cubicle Power

 

  • 10 KVA Isolation Transformer Installation for Cone Calorimeter
  • Elevator Replacement Project
  • Heater and Door Replacement Project
  • Lab Lighting Upgrade
  • Surge Protector
  • Circuit Replacement in Blending Room

University of Illinois Medical Center

Work completed:

  • GE PET/CT Scanner Project

U.S. Army Corps of Engineers

Work completed:

  • Chicago Sanitary and Ship Canal (CSSC) Electric Fish (Asian Carp) Barrier Project

U.S. General Services Administration

Work completed:

  • Electrical Work for Façade Stabilization

Wheaton Metra Security Camera Upgrade

Work completed:

  • Downtown Parking Garage
  • East Parking Garage

Westlake Hospital

Work completed:

VA Ann Arbor Healthcare System (Ann Arbor, Michigan)

Work in progress:

  • Varian Medical Systems Linear Accelerator

Victory Apostolic Church

Work completed:

  • Surge Protector and Service Installations